An objective function $Z$ of primal variables ( $x_{1}$ and $x_{2}$ ) is described below:\[\begin{array}{ll}\text { Minimize } Z= & 0.07 x_{1}+0.05 x_{2} \\\text { subjec...
0 0 votes
0 0 answers
52
52 views
The activities of a PERT network and their corresponding activity time estimates (in weeks) i.e., optimistic ( $t_{o}$ ), most likely ( $t_{m}$ ), and pessimistic ( $t_{p...
0 0 votes
0 0 answers
176
176 views
A project involves eight activities with the precedence relationship and duration as shown in the table below. The slack for the activity $D$ is _________ hours (answer i...
0 0 votes
0 0 answers
803
803 views
​​​​At the current basic feasible solution $\text{(bfs)}$ $v_{0}\left(v_{0} \in \mathbb{R}^{5}\right)$, the simplex method yields the following form of a linear programmi...
0 0 votes
0 0 answers
1.3k
1.3k views
In a supplier-retailer supply chain, the demand of each retailer, the capacity of each supplier, and the unit cost in rupees of material supply from each supplier to each...
0 0 votes
0 0 answers
1.4k
1.4k views
Which one of the options given represents the feasible region of the linear programming model:$$\begin{gathered}\text { Maximize } 45 X_1+60 X_2 \\X_1 \leq 45 \\X_2 \leq ...
0 0 votes
0 0 answers
679
679 views
An electric car manufacturer underestimated the January sales of car by $20$ units, while the actual sales was $120$ units. If the manufacturer uses exponential smoothing...
0 0 votes
0 0 answers
290
290 views
Parts $P1 – P7$ are machined first on a milling machine and then polished at a separate machine. Using the information in the following table, the minimum total completio...
0 0 votes
0 0 answers
482
482 views
A manufacturing unit produces two products $P1$ and $P2$. For each piece of $P1$ and $P2$, the table below provides quantities of materials $\text{M1, M2}$ and $M3$ requi...
0 0 votes
0 0 answers
256
256 views
A project consists of five activities $\text{(A, B, C, D and E)}$. The duration of each activity follows beta distribution. The three time estimates (in weeks) of each ac...
0 0 votes
0 0 answers
387
387 views
In a linear programming problem, if a resource is not fully utilized, the shadow price of that resource ispositivenegativezeroinfinity
0 0 votes
0 0 answers
417
417 views
Activities $A$ to $K$ are required to complete a project. The time estimates and the immediate predecessors of these activities are given in the table. If the project is ...
0 0 votes
0 0 answers
406
406 views
An assignment problem is solved to minimize the total processing time of four jobs ($1,2,3$ and $4$) on four different machines such that each job is processed exactly by...
0 0 votes
0 0 answers
272
272 views
A set of jobs $\text{A, B, C, D, E, F, G, H}$ arrive at time $t= 0$ for processing on turning and grinding machines. Each job needs to be processed in sequence first on ...
0 0 votes
0 0 answers
247
247 views
Consider a single machine workstation to which jobs arrive according to a Poisson distribution with a mean arrival rate of $12$ jobs/hour. The process time of the worksta...
0 0 votes
0 0 answers
337
337 views
Consider the following network of activities, with each activity named $\textbf{A – L}$, illustrated in the nodes of the network.The number of hours required for each act...
0 0 votes
0 0 answers
312
312 views
In the Critical Path Method $(CPM)$, the cost-time slope of an activity is given by$\dfrac{\text{Crash Cost – Normal Cost}}{\text{Crash Time}} \\$$\dfrac{\text{Normal Cos...
0 0 votes
0 0 answers
442
442 views
For a particular project, eight activities are to be carried out. Their relationships with other activities and expected durations are mentioned in the table below.$\begi...
1 1 vote
0 0 answers
548
548 views
For a particular project, eight activities are to be carried out. Their relationships with other activities and expected durations are mentioned in the table below.$\begi...
1 1 vote
0 0 answers
455
455 views
The arc lengths of a directed graph of a project are as shown in the figure. The shortest path length from node $1$ to node $6$ is __________
0 0 votes
0 0 answers
236
236 views
In PERT chart, the activity time distribution isNormalBinomialPoissonBeta
0 0 votes
0 0 answers
250
250 views
In a single-channel queuing model, the customer arrival rate is $12$ per hour and the serving rate is $24$ per hour. The expected time that a customer is in queue is ____...
0 0 votes
0 0 answers
301
301 views
In the notation $(a/b/c) : (d/e/f)$ for summarizing the characteristics of queuing situation, the letters $‘b’$ and $‘d’$ stand respectively forservice time distribution ...
0 0 votes
0 0 answers
452
452 views
A minimal spanning tree in network flow models involvesall the nodes with cycle/loop allowedall the nodes with cycle/loop not allowedshortest path between start and end n...