GATE Mechanical 2026 | Question: 37
Four jobs are on order in a factory. As on day $20$ of the production calendar, the corresponding due date and work remaining to complete these jobs (in days) are given i...
gatecse
58
views
asked
Feb 23
Production, Planning and Control
gateme-2026
production-planning-and-control
operations-research
analytical-aptitude
+
–
0
0 votes
0
0 answers
893
893 views
GATE Mechanical 2024 | Question: 24
A set of jobs $\text{U, V, W, X, Y, Z}$ arrive at time $t=0$ to a production line consisting of two workstations in series. Each job must be processed by both workst...
admin
893
views
asked
Feb 16, 2024
Production, Planning and Control
gateme-2024
production-planning-and-control
operations-research
applied-mechanics-and-design
+
–
0
0 votes
0
0 answers
527
527 views
GATE Mechanical 2022 Set 2 | Question: 11
Match the additive manufacturing technique in Column $\text{I}$ with its corresponding input material in Column $\text{II}$. Additive manufacturing technique (Column $\t...
Arjun
527
views
asked
Feb 15, 2022
Production, Planning and Control
gateme-2022-set2
materials-manufacturing-and-industrial-engineering
casting-forming-and-joining-processes
+
–
0
0 votes
0
0 answers
307
307 views
GATE Mechanical 2021 Set 2 | Question: 29
A factory produces $m (i= 1,2,\cdots, m)$ products, each of which requires processing on $n(j = 1,2,\cdots, n)$ workstations. Let $a_{ij}$ be the amount of processing ti...
go_editor
307
views
asked
Mar 1, 2021
Production, Planning and Control
gateme-2021-set2
operations-research
production-planning-and-control
inventory-control
+
–
0
0 votes
0
0 answers
259
259 views
GATE Mechanical 2021 Set 2 | Question: 43
The demand and forecast of an item for five months are given in the table.$$\begin{array}{|cl|cI|cI|}\hline&\textbf{Month} & \textbf{Demand} & \textbf{Forecast} \\ \hline...
go_editor
259
views
asked
Mar 1, 2021
Production, Planning and Control
gateme-2021-set2
numerical-answers
production-planning-and-control
quantitative-aptitude
operations-research
+
–
0
0 votes
0
0 answers
476
476 views
GATE Mechanical 2021 Set 1 | Question: 37
The resistance spot welding of two $\text{1.55 mm}$ thick metal sheets is performed using welding current of $\text{10000 A}$ for $\text{0.25 s}$. The contact resistance ...
gatecse
476
views
asked
Feb 22, 2021
Production, Planning and Control
gateme-2021-set1
numerical-answers
casting-forming-and-joining-processes
materials-manufacturing-and-industrial-engineering
+
–
0
0 votes
0
0 answers
379
379 views
GATE2018-1-16
The time series forecasting method that gives equal weightage to each of the $m$ most recent observations isMoving average methodExponential smoothing with linear trendTr...
Arjun
379
views
asked
Feb 17, 2018
Production, Planning and Control
gateme-2018-set1
forecasting-models
production-planning-and-control
materials-manufacturing-and-industrial-engineering
+
–
0
0 votes
0
0 answers
192
192 views
GATE2015-2-25
Sales data of a product is given in the following table:$\begin{array}{|l|l|l|l|l|l|} \hline \textbf{Month} & \text{January} & \text{February} & \text{March} & \text{Apri...
Arjun
192
views
asked
Feb 24, 2017
Production, Planning and Control
gateme-2015-set2
forecasting-models
production-planning-and-control
materials-manufacturing-and-industrial-engineering
+
–
0
0 votes
0
0 answers
293
293 views
GATE ME 2013 | Question: 14
In simple exponential smoothing forecasting, to give higher weightage to recent demand information, the smoothing constant must be close to$-1$$\text{zero}$$0.5$$1.0$
piyag476
293
views
asked
Feb 19, 2017
Production, Planning and Control
gateme-2013
exponential-distribution
discrete-mathematics
+
–