In PERT chart, the activity time distribution is

  1. Normal
  2. Binomial
  3. Poisson
  4. Beta
in Operations Research 24.6k points
recategorized by

Please log in or register to answer this question.

Answer:

Related questions

0 votes
0 answers
A firm uses a turning center, a milling center and a grinding machine to produce two parts. The table below provides the machining time required for each part and the maximum machining time available on each machine. The profit per unit on parts $I$ and $II$ are $Rs. 40$ ... week (minutes) I II Turning machine $12$ $6$ $6000$ Milling center $4$ $10$ $4000$ Grinding Machine $2$ $3$ $1800$
asked Feb 24, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
The demand for a two-wheeler was $900$ units and $1030$ units in April $2015$ and May $2015$, respectively. The forecast for the month of April $2015$ was $850$ units. Considering a smoothing constant of $0.6$, the forecast for the month of June $2015$ is $850$ units $927$ units $965$ units $970$ units
asked Feb 24, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
0 votes
0 answers
In the notation $(a/b/c) : (d/e/f)$ for summarizing the characteristics of queuing situation, the letters $‘b’$ and $‘d’$ stand respectively for service time distribution and queue discipline number of servers and size of calling source number of servers and queue discipline service time distribution and maximum number allowed in system
asked Feb 24, 2017 in Operations Research Arjun 24.6k points
0 votes
0 answers
A minimal spanning tree in network flow models involves all the nodes with cycle/loop allowed all the nodes with cycle/loop not allowed shortest path between start and end nodes all the nodes with directed arcs
asked Feb 19, 2017 in Operations Research Arjun 24.6k points
...