search
Log In
0 votes
In a single-channel queuing model, the customer arrival rate is $12$ per hour and the serving rate is $24$ per hour. The expected time that a customer is in queue is _______ minutes.
in Operations Research 24.6k points
recategorized by

Please log in or register to answer this question.

Answer:

Related questions

0 votes
0 answers
In the notation $(a/b/c) : (d/e/f)$ for summarizing the characteristics of queuing situation, the letters $‘b’$ and $‘d’$ stand respectively for service time distribution and queue discipline number of servers and size of calling source number of servers and queue discipline service time distribution and maximum number allowed in system
asked Feb 24, 2017 in Operations Research Arjun 24.6k points
0 votes
0 answers
0 votes
0 answers
0 votes
0 answers
0 votes
0 answers
For a certain job,the cost of metal cutting is $Rs$. $18C/V$ and the cost of tooling is $Rs$. $270C/(TV)$,where $C$ is a constant,$V$ is the cutting speed in $m/min$ and $T$ is the tool life in minutes.The Taylor's tool life equation is $VT^{0.25}$-$150$.The cutting speed (in $m/min$) for the minimum tool cost is
asked Feb 24, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
...