recategorized by
468 views
0 0 votes
A cast iron block of $200$ $mm$ length is being shaped in a shaping machine with a depth of cut of $4$ $mm$, feed of $0.25$ $mm$/stroke and the tool principal cutting edge angle of $30^{\circ}$. Number of cutting strokes per minute is $60$. Using specific energy for cutting as $1.49$ $J/mm^3$, the average power consumption (in watt) is _______

Please log in or register to answer this question.

Related questions

0 0 votes
0 0 answers
296
296 views
Arjun asked Feb 19, 2017
296 views
Two separate slab milling operations, $1$ and $2$, are performed with identical milling cutters. The depth of cut in operation $2$ is twice that in operation $1$. The oth...
0 0 votes
0 0 answers
492
492 views
Arjun asked Feb 19, 2017
492 views
Better surface finish is obtained with a large rake angle becausethe area of shear plane decreases resulting in the decrease in shear force and cutting forcethe tool beco...
0 0 votes
0 0 answers
370
370 views
Arjun asked Feb 19, 2017
370 views
A cylindrical riser of $6\text{ cm}$ diameter and $6 \text{ cm}$ height has to be designed for a sand casting mould for producing a steel rectangular plate casting of $7 ...
0 0 votes
0 0 answers
417
417 views
Arjun asked Feb 19, 2017
417 views
At a work station, $5$ jobs arrive every minute. The mean time spent on each job in the work station is $1/8$ minute. The mean steady state number of jobs in the system i...

Related questions

0 0 votes
0 0 answers
296
296 views
Arjun asked Feb 19, 2017
296 views
Two separate slab milling operations, $1$ and $2$, are performed with identical milling cutters. The depth of cut in operation $2$ is twice that in operation $1$. The oth...
0 0 votes
0 0 answers
492
492 views
Arjun asked Feb 19, 2017
492 views
Better surface finish is obtained with a large rake angle becausethe area of shear plane decreases resulting in the decrease in shear force and cutting forcethe tool beco...
0 0 votes
0 0 answers
370
370 views
Arjun asked Feb 19, 2017
370 views
A cylindrical riser of $6\text{ cm}$ diameter and $6 \text{ cm}$ height has to be designed for a sand casting mould for producing a steel rectangular plate casting of $7 ...
0 0 votes
0 0 answers
417
417 views
Arjun asked Feb 19, 2017
417 views
At a work station, $5$ jobs arrive every minute. The mean time spent on each job in the work station is $1/8$ minute. The mean steady state number of jobs in the system i...
Position:
Show:
Answer:

Add Synced Question

×