edited by
0 votes
0 votes

A point $‘P’$ on a CNC controlled $XY$-stage is moved to another point $‘Q’$ using the coordinate system shown in the figure below and rapid positioning command $(G00)$

A pair of stepping motors with maximum speed of $800$ rpm, controlling both the $X$ and $Y$ motion of the stage, are directly coupled to a pair of lead screws, each with a uniform pitch of $0.5$ mm. The time needed to position the point $‘P’$ to the point $‘Q’$ is _________ minutes (round off to $2$ decimal places).

edited by

Please log in or register to answer this question.

Answer:

Related questions

0 answers
0 votes
go_editor asked Sep 18, 2020
A beam of negligible mass is hinged at support $P$ and has a roller support $Q$ as shown in the figure.A point load of $1200 \: N$ is applied at point $R$. The magnitude ...
0 answers
0 votes
0 answers
0 votes
0 answers
0 votes
go_editor asked Sep 18, 2020
Consider the following network of activities, with each activity named $\textbf{A – L}$, illustrated in the nodes of the network.The number of hours required for each a...