Air flows at the rate of $1.5 \: m^3/s$ through a horizontal pipe with a gradually reducing cross-section as shown in the figure. The two cross-sections of the pipe have diameters of the $400 \: mm$ and $200 \: mm$. Take the air density as $1.2 \: kg/m^3$ and assume inviscid incompressible flow. The change in pressure $(p_2-p_1)$ (in $kPa$) between sections $1$ and $2$ is

  1. $-1.28$
  2. $2.56$
  3. $- 2.13$
  4. $1.28$

Please log in or register to answer this question.

Related questions

0 0 votes
0 0 answers
625
625 views
Arjun asked Feb 17, 2018
625 views
A frictionless circular piston of area $10^{-2} \: m^2$ and mass $100 \: kg$ sinks into a cylindrical container of the same area filled with water of density $1000 \: kg/...
0 0 votes
0 0 answers
237
237 views
Arjun asked Feb 17, 2018
237 views
The viscous laminar flow of air over a flat plate results in the formation of a boundary layer. The boundary layer thickness at the end of the plate of length $L$ is $\de...
6 6 votes
6 answers 6 answers
1.2k
1.2k views
Arjun asked Feb 17, 2018
1,169 views
A house has a number which need to be identified. The following three statements are given that can help in identifying the house number?If the house number is a multiple...
12 12 votes
4 answers 4 answers
2.7k
2.7k views
Arjun asked Feb 17, 2018
2,664 views
A contract is to be completed in $52$ days and $125$ identical robots were employed, each operational for $7$ hours a day. After $39$ days, five-seventh of the work was c...

Related questions

0 0 votes
0 0 answers
625
625 views
Arjun asked Feb 17, 2018
625 views
A frictionless circular piston of area $10^{-2} \: m^2$ and mass $100 \: kg$ sinks into a cylindrical container of the same area filled with water of density $1000 \: kg/...
0 0 votes
0 0 answers
237
237 views
Arjun asked Feb 17, 2018
237 views
The viscous laminar flow of air over a flat plate results in the formation of a boundary layer. The boundary layer thickness at the end of the plate of length $L$ is $\de...
6 6 votes
6 answers 6 answers
1.2k
1.2k views
Arjun asked Feb 17, 2018
1,169 views
A house has a number which need to be identified. The following three statements are given that can help in identifying the house number?If the house number is a multiple...
12 12 votes
4 answers 4 answers
2.7k
2.7k views
Arjun asked Feb 17, 2018
2,664 views
A contract is to be completed in $52$ days and $125$ identical robots were employed, each operational for $7$ hours a day. After $39$ days, five-seventh of the work was c...
Position:
Show:
Answer:

Add Synced Question

×