Match the processes with their characteristics:

$\begin{array}{|l|l|l|} \hline & \textbf{Process} & & \textbf{Characteristics} \\ \hline P. & \text{Electrical Discharge Machining} & 1. & \text{No residual stress} \\ \hline Q. & \text{Ultrasonic Machining} &2. & \text{Machining of electrically conductive materials} \\ \hline R. & \text{Chemical Machining} & 3. & \text{Machining of glass} \\ \hline S. & \text{Ion Beam Machining} & 4. & \text{Nano-machining} \\ \hline \end{array}$

  1. $P-2, Q-3, R-1, S-4$
  2. $P-3, Q-2, R-1, S-4$
  3. $P-3, Q-2, R-4, S-1$
  4. $P-2, Q-4, R-3, S-1$
in Materials, Manufacturing and Industrial Engineering 24.6k points
recategorized by

Please log in or register to answer this question.

Answer:

Related questions

0 votes
0 answers
Two cutting tools with tool life equations given below are being compared: Tool $1$: $VT^{0.1}=150$ Tool $2$: $VT^{0.3}=300$ where $V$ is cutting speed in m/minute and $T$ is tool life in minutes. The breakeven cutting speed beyond which Tool $2$ will have a higher tool life is ________ m/minute.
asked Feb 27, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
A block of length $200$ mm is machined by a slab milling cutter $34$ mm in diameter. The depth of cut and table feed are set at $2$ mm and $18$ mm/minute, respectively. Considering the approach and the over travel of the cutter to be same, the minimum estimated machining time per pass is ________ minutes.
asked Feb 27, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
A sprue in a sand mould has a top diameter of $20 \: mm$ and height of $200$ mm. The velocity of the molten metal at the entry of the sprue is $0.5 \: m/s$. Assume acceleration due to gravity as $9.8 \: m/s^{2}$ and neglect all losses. If the mould is well ventilated, the velocity (upto $3$ decimal points accuracy) of the molten metal at the bottom of the sprue is _________ $m/s$
asked Feb 27, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
Following data refers to the jobs $(P, Q, R, S)$ which have arrived at a machine for scheduling. The shortest possible average flow time is __________ days. $\begin{array}{|l|l|} \hline \text{Job} & \text{Processing Time (days)} \\ \hline P & 15 \\ \hline Q & 9 \\ \hline R & 22 \\ \hline S & 12 \\ \hline \end{array}$