The part of a gating system which regulates the rate of pouring of molten metal is

  1. pouring basin
  2. runner
  3. choke
  4. ingate
in Materials, Manufacturing and Industrial Engineering 24.6k points
recategorized by

Please log in or register to answer this question.

Answer:

Related questions

0 votes
0 answers
Under optimal conditions of the process the temperatures experienced by a copper work piece in fusion welding, brazing and soldering are such that $T_{\text{welding}} > T_{\text{soldering}}> T_{\text{brazing}}$ $T_{\text{soldering}} > T_{\text{welding}} > T_{\text{brazing}}$ ... $T_{\text{welding}} > T_{\text{brazing}} > T_{\text{soldering}}$
asked Feb 24, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
A plastic sleeve of outer radius $r_0=1$ $mm$ covers a wire (radius $r=0.5\:mm$) carrying electric current. Thermal conductivity of the plastic is $0.15 W/m-K$. The heat transfer coefficient on the outer surface of the sleeve exposed to air is $25 W/m^2-K$. Due to the addition of the plastic cover, the heat transfer from the wire to the ambient will increase remain the same decrease be zero
asked Feb 24, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
0 votes
0 answers
A sheet metal with a stock hardness of $250\: HRC$ has to be sheared using a punch and a die having a clearance of $\text{1 mm}$ between them. If the stock hardness of the sheet metal increases to $400\: HRC$, the clearance between the punch and the die should be _________ $mm.$
asked Feb 19, 2020 in Materials, Manufacturing and Industrial Engineering jothee 4.9k points
...