Match the Machine Tools (Group A) with the probable Operations (Group B):

$$\begin{array}{|c|c|c|c|} \hline & \textbf{Group A} & & \textbf{Group B} \\ \hline P: & \text{Centre Lathe} & 1: & \text{Slotting} \\ \hline Q: & \text{Milling} & 2: & \text{Counter-boring} \\ \hline R: & \text{Grinding} & 3: & \text{Knurling} \\ \hline S: & \text{Drilling} & 4: & \text{Dressing} \\ \hline \end{array}$$

  1. $P-1, Q-2, R-4, S-3$
  2. $P-2, Q-1, R-4, S-3$
  3. $P-3, Q-1, R-4, S-2$
  4. $P-3, Q-4, R-2, S-1$
in Materials, Manufacturing and Industrial Engineering 24.6k points
recategorized by

Please log in or register to answer this question.

Answer:

Related questions

0 votes
0 answers
A hole of $20$ $mm$ diameter is to be drilled in a steel block of $40$ $mm$ thickness. The drilling is performed at rotational speed of $400$ $rpm$ and feed rate of $0.1$ $mm/rev$. The required approach and over run of the drill together is equal to the radius of drill. The drilling time (in minute) is $1.00$ $1.25$ $1.50$ $1.75$
asked Feb 19, 2017 in Materials, Manufacturing and Industrial Engineering Arjun 24.6k points
...